Data Decommissioning Services Perth

Secure Data Centre Decommissioning Services in Perth

Cyber Recycling provides end-to-end data centre and server room decommissioning for Perth businesses. We collect equipment from your site, destroy all stored data, recover value from reusable hardware and recycle the remainder under AS 5377. Every asset is tracked by serial number and documented for audit.

12+Years of experience
ISO 14001Environmental management
ISO 45001Health and safety
AS 5377Certified e-waste processing
At a glance

Our Decommissioning Service at a Glance

We manage projects of every size, from a single rack to a complete data hall. Our team plans the work, de-installs and collects the equipment, and tracks each item from your site to its final destination.

  • Data-bearing devices are erased and verified, or physically destroyed.
  • Equipment with resale value is refurbished and sold to offset project costs.
  • All other equipment is recycled under AS 5377. Nothing is sent to landfill.
  • Every project closes with a serial-level report and certificates.
Definition

Data Centre Decommissioning: Definition and Scope

Data centre decommissioning is the controlled retirement of IT infrastructure that is no longer required. It applies to servers, storage, network equipment, racks, and supporting power and cooling systems. A complete decommission has five components:

  • A full asset inventory, recorded by serial number
  • A planned shutdown sequence that protects live services
  • Erasure or destruction of all stored data
  • Reuse, resale or recycling of each item
  • Documentation confirming the outcome for every asset
Services

IT Asset Disposition for Perth Server Rooms and Data Centres

IT asset disposition (ITAD) is the secure, documented process for retiring hardware. Our ITAD service covers seven stages. Each stage produces a record that feeds your audit file.

Asset audit

We record each asset by make, model and serial number and reconcile the list against your asset register. This record forms the basis of your chain of custody.

DeliverableSerial-numbered asset register
Methods

Destruction Methods by Media Type

Each storage technology requires its own data destruction method. A method that is effective on one media type can leave data recoverable on another.

Recommended data destruction method for each storage media type
MediaWhere data is storedRequired method
Hard disk drives (HDD)Magnetic plattersVerified software erasure for reuse; shredding at end of life or for sensitive data
SSD and NVMe drivesFlash memory, including spare cells not visible to the operating systemVerified purge-level erasure or cryptographic erase; otherwise shredding. Overwriting and degaussing are not reliable on flash
Self-encrypting drivesHardware-encrypted storageVerified cryptographic erase, or shredding
Backup tapes (LTO)Magnetic tapeShredding; degaussing only where the tape will not be reused
Switches, firewalls and appliancesConfigurations, credentials and logs in onboard flashConfiguration wipe and factory reset, or destruction of the storage module
Server management controllers (iLO, iDRAC, BMC)Credentials and network settingsFactory reset before resale
Benefits

Why Use a Certified Decommissioning Provider

  • Verified data destructionSerial-level certificates confirm how and when each drive was sanitised or destroyed.
  • Regulatory evidenceDocumentation supports your obligations under the Privacy Act 1988 and WA e-waste regulations.
  • Minimal disruptionRemovals are scheduled around your migration plan, including after hours.
  • Cost recoveryResale proceeds offset project costs.
  • Zero landfillAll non-reusable equipment is recycled under AS 5377.
  • Safe site practicesISO 45001-certified procedures govern power isolation, manual handling and rack removal.
  • Single point of accountabilityOne provider manages collection, destruction, resale and recycling.
  • Documented chain of custodyEvery asset is scanned at collection and tracked to its final destination.
Project snapshot

Project Snapshot: Perth Server Room Decommission

ScrollUse the arrows to move through each stage of the project.

01The brief
1 / 3

A lease deadline and a room full of sensitive data

A Perth IT company migrated its workloads to the cloud and needed to vacate its server room before the lease expired. The room contained 8 server racks, storage and network equipment, along with 120 drives holding customer and operational data.


The client required documented proof of drive destruction while ensuring that systems still in service experienced no downtime.

Industry
IT
Location
Perth
Racks
8
Drives
120
02Our approach
2 / 3

Staged removal, tracked by serial number

Every system was released only after its workload was signed off, so live services stayed up throughout the project.

  1. AuditCyber Recycling audited the room and reconciled every serial number against the client's register.
  2. Staged removalWe removed equipment in stages, releasing each system only after the client signed off the corresponding workload.
  3. Data destructionReusable drives were erased and verified; the remainder were shredded.
  4. Resale and recyclingServers with resale value were refurbished, and the remaining equipment, cabling and racks were recycled under AS 5377.
03The outcome
3 / 3

Every drive accounted for, on time

Premises returned in time for lease make-good

  • 8 server racks Assets removed in 3 days, with no unplanned downtime
  • 100%Drives erased or destroyed, each with a serialised certificate
  • $4,500 Value returned through resale
  • 95%Material diverted from landfill
Related services

Additional Services

Related Cyber Recycling services that support your decommissioning project.

IT Asset Lifecycle Management

Track hardware from deployment to retirement, with planned refresh cycles that lead directly into secure decommissioning.

Data Deletion

Verified erasure of drives and devices prepared for reuse, with a serialised record for every item.

IT Asset Disposal & Value Recovery

Retired servers, network equipment and end-user devices are assessed, refurbished and resold, with the return credited against project costs.

E-Waste Recycling

AS 5377 certified recycling for electronic equipment that cannot be reused, in line with WA's e-waste landfill ban.

When to act

When to Decommission IT Infrastructure

Perth organisations typically decommission infrastructure in the following situations.

  • Cloud migrationWorkloads move off-site, leaving idle hardware that still holds sensitive data.
  • End of vendor supportUnsupported equipment can no longer be patched and becomes a security liability.
  • Mergers and acquisitionsDuplicate server rooms and overlapping equipment are consolidated into one environment.
  • Lease expiry or relocationLandlords require the space cleared and restored to original condition before handover.
  • Site closureA project site, branch or regional office closes, leaving equipment to be cleared.
  • Rising operating costsOlder equipment consumes more power and cooling than current, efficient hardware.
  • RestructureSurplus assets must be disposed of quickly, with a complete record for each item.
  • Hardware refreshPlanned upgrades replace ageing servers, storage and network equipment on a fixed cycle.
Risks

Consequences of an Inadequate Decommission

  • Data breachOne unsanitised drive can expose personal data and trigger notification under the NDB scheme.
  • Untracked assetsWithout serial-level records, retired equipment cannot be accounted for during an audit.
  • Regulatory breachSending regulated e-waste to landfill contravenes Western Australia's e-waste landfill ban.
  • Lost valueEquipment left sitting in storage depreciates quickly and loses most of its resale value.
  • Service outagesRemoving the wrong cable or server disrupts systems that are still in use.
  • Workplace injuryHeavy loaded racks and live power circuits present serious safety risks to staff.
  • Lease penaltiesResidual cabling and fit-out delay handover and attract costly make-good charges.
  • Reputational damageA publicised data incident erodes the trust of customers, partners and regulators.
Compliance

Compliance Obligations in Australia and Western Australia

Federal

Privacy Act 1988 (Cth)

Australian Privacy Principle 11 requires organisations covered by the Act to take reasonable steps to destroy or de-identify personal information they no longer need. Certified destruction records provide evidence of those steps.

Federal

Notifiable Data Breaches scheme

Where personal information is exposed and serious harm is likely, organisations must notify the Office of the Australian Information Commissioner and affected individuals.

Western Australia

WA e-waste to landfill ban

Since 1 July 2024, the Waste Avoidance and Resource Recovery (e-waste) Regulations 2024 have prohibited significant business and public entities, and e-waste service providers, from sending regulated commercial e-waste to landfill. The regulations reference AS 5377:2022. Cyber Recycling is AS 5377 certified.

Sector

Sector requirements

APRA-regulated entities must meet CPS 234 information security requirements. Government agencies may be required to follow the Australian Government Information Security Manual. WA public sector bodies must confirm disposal authority under the State Records Act 2000 before destroying records.

Our certifications

ISO 14001 (environmental management) and ISO 45001 (occupational health and safety) govern how we deliver every project. AS 5377 governs how equipment is processed.

This section is general information, not legal advice. Confirm your obligations with your compliance or legal team.

Preparation

Preparing Your Site for Decommissioning

  • Engage early: Involve your decommissioning provider during migration planning.
  • Reconcile your asset register: Verify that recorded assets match installed equipment.
  • Confirm data migration: Verify that migrations are complete and that backups restore successfully before shutdown.
  • Classify data by sensitivity: Define which drives may be erased for reuse and which must be destroyed.
  • Map dependencies: Identify the systems, circuits and cabling that must remain live.
  • Arrange access: Confirm inductions, visitor approvals, loading dock and goods-lift bookings with your building or colocation provider.
  • Review the certificate format: Confirm certificates include serial numbers, method, date and technician.
  • Retain record:. File certificates and reports with your privacy and audit documentation.
Cabling

Cabling and Its Impact on Decommissioning

Cabling is the main cause of delay during equipment removal. Labelled, documented cabling allows technicians to identify inactive connections quickly and remove them safely. Undocumented cabling must be traced manually, which extends the work and increases the risk of disconnecting live services.

For rooms expanded over several years, we recommend tracing and labelling cabling before removal. Redundant cable in ceilings, risers and underfloor spaces is often a make-good requirement and should be included in scope. Recovered copper is recycled; patch leads and fibre are processed separately.

Why Cyber Recycling

Why Choose Cyber Recycling

  • 12+ years experienceIn IT recycling and secure disposal.
  • Certif ied processesISO 14001, ISO 45001 and AS 5377.
  • Onsite collectionAcross the Perth metropolitan area.
  • End-to-end deliveryAudit, removal, data destruction, resale, recycling and reporting.
  • Scalable capacityFrom a single comms cabinet to a full data hall.
  • Complete documentationFor every serial number.
Service area

Service Area

We service the Perth metropolitan area, including:

  • Perth CBD
  • West Perth
  • Osborne Park
  • Malaga
  • Welshpool
  • Kewdale
  • Canning Vale
  • Belmont
  • Joondalup
  • Fremantle
  • Rockingham
  • Midland
Data protection

Decommissioning as a Data Protection Obligation

Decommissioning is the final stage of your obligation to protect the information you hold. A controlled process with serial-level tracking, verified destruction and certified recycling removes residual data risk, recovers value and keeps equipment out of landfill.

Process

Our Seven-Step Process

A defined sequence from first enquiry to final certificate, with every asset tracked throughout.

  1. Enquiry

    Contact us with your scope and timeline.

  2. Site assessment

    We assess access, equipment volumes and data security requirements, then issue a written proposal.

  3. Asset audit

    Every item is recorded by serial number and reconciled against your register.

  4. De-installation and collection

    Our technicians power down, disconnect, pack and load equipment onsite, staged to your cut-over where required.

  5. Data sanitisation or destruction

    Drives are erased and verified, or shredded, according to your policy.

  6. Resale and recycling

    Eligible equipment is refurbished for resale. All other equipment is recycled under AS 5377.

  7. Reporting

    You receive an asset report, destruction certificates and recycling certificates.

FAQ

Data Decommissioning FAQs

What is the difference between data decommissioning and data centre decommissioning?

Data decommissioning retires an application or database by archiving or deleting its records. Data centre decommissioning retires the physical infrastructure. Both require the storage media to be sanitised or destroyed, with documented evidence.

What is data centre IT asset disposition?

Data centre IT asset disposition (ITAD) involves securely managing retired IT equipment through data destruction, reuse, resale and recycling.

What assets are included in a data centre decommissioning project?

Assets can include servers, storage devices, networking equipment, computers, monitors, racks and other IT hardware.

How do ITAD services support data centre decommissioning?

ITAD services manage retired equipment from removal to data destruction and final disposal, including asset tracking, value recovery and recycling.

Do you collect from anywhere in Perth?

Yes. We provide onsite collection across the Perth metropolitan area.

How is data destroyed on SSDs compared with hard drives?

Hard drives are overwritten and verified, or shredded. SSDs require purge-level erasure designed for flash memory, or shredding. Overwriting alone is unreliable on SSDs, and degaussing has no effect.

Will I receive a certificate of destruction?

Yes. Certificates list each data-bearing device by serial number, with the method and date. You also receive recycling certificates and a full asset report.

Can servers be disposed of in landfill in WA?

No. Since 1 July 2024, WA's e-waste to landfill ban has applied to significant business and public entities. Servers, storage and network equipment must be processed by a certified recycler.

How much does data centre decommissioning cost in Perth?

Cost depends on asset volume and type, the number of drives requiring destruction, site access, after-hours requirements and resale value. Resale proceeds often offset part of the cost. Contact us for a site-specific quote.

How long does a decommissioning project take?

A small server room is typically cleared in a single visit. Larger rooms and data halls are staged over several days or weeks to match the migration plan. The timeline is confirmed during scoping.

Is there a financial return on old equipment?

Current-generation servers, storage and network equipment in working order typically have resale value. We report the value returned on every project.

What happens to retired servers and storage devices?

Retired equipment is assessed for reuse, refurbishment or resale, while unsuitable devices are sent for responsible recycling after appropriate data destruction.

How can organisations maximise value recovery during a decommissioning project?

Organisations can maximise value recovery by identifying reusable equipment, maintaining an accurate asset register and assessing hardware for resale before recycling.

Do you remove racks, cabling and UPS equipment?

Yes. Racks, cabling, PDUs and UPS equipment can be included in scope and recycled through the appropriate streams.

Can you work after hours or in colocation facilities?

Yes. We schedule work outside business hours and comply with colocation access, induction and escort requirements.

Get started

Book a Decommissioning Consultation

Contact Cyber Recycling to scope your server room or data centre project. We provide onsite collection, certified data destruction and complete documentation for every asset.